CÁC CHỨC NĂNG LỰA CHỌN CỦA THANG MÁY (OPTION)
|
Function |
Descriptions |
|
Automatic rescue device(ARD) |
During normal power failure, the ARD converts stored energy from its bank of |
|
Fireman emergency operation |
When the control panel receives the fire direction signal, all call are canceled, |
|
Fireman emergency service |
When the fireman’s switch is activated, all car & hall calls are automatically |
|
Earthquake operation |
When there is an earthquake, the earthquake direction system will transfer |
|
Supervisor software conection |
With above feature can supervise the elevator operation such as status , |
|
Using IC card |
Car & hall call supervision by IC card. |
|
Car arrival chime with voice |
The voice synthesizer will announce the arrival floor, up or down direction and |
|
Door opening in advance |
The elevator doors will open before landing completely at a specified floor |
|
Hall lantern |
Before the car arrives the destination floor, the hall lanterns on that floor will |
|
Duplex operation |
The hall calls are assigned for a group of 2 elevators by using intelligence |
|
Group control |
The group control panel can operate a group of 8 elevators and assign the hall |
|
Continuity of service |
The system will exclude an elevator from the assignment of hall alls when |
|
Function |
Descriptions |
|
Automatic rescue device(ARD) |
During normal power failure, the ARD converts stored energy from its bank of |
|
Fireman emergency operation |
When the control panel receives the fire direction signal, all call are canceled, |
|
Fireman emergency service |
When the fireman’s switch is activated, all car & hall calls are automatically |
|
Earthquake operation |
When there is an earthquake, the earthquake direction system will transfer |
|
Supervisor software conection |
With above feature can supervise the elevator operation such as status , |
|
Using IC card |
Car & hall call supervision by IC card. |
|
Car arrival chime with voice |
The voice synthesizer will announce the arrival floor, up or down direction and |
|
Door opening in advance |
The elevator doors will open before landing completely at a specified floor |
|
Hall lantern |
Before the car arrives the destination floor, the hall lanterns on that floor will |
|
Duplex operation |
The hall calls are assigned for a group of 2 elevators by using intelligence |
|
Group control |
The group control panel can operate a group of 8 elevators and assign the hall |
|
Continuity of service |
The system will exclude an elevator from the assignment of hall alls when |
Module con cùng loại
Sản phẩm khác
Khách hàng
Copyright © 2018 CÔNG TY TNHH KỸ THUẬT THANG MÁY SÀI THÀNH Designed by:Nina Co.,Ltd
Đang online: 3
Thống kê ngày: 151
Thống kê tháng: 151
Tổng truy cập: 457621

